Galston Aquatic and Leisure Centre reopened in September after much needed structural repairs and renovations were completed. The repairs turned out to be larger than expected with a full internal renovation on the pool, change rooms, upgrade of the centre and resurfacing of the concourse.
The pool’s terracotta sewage and drainage pipes were removed from the base of the pool and were replaced with new pipes. The pool’s walls were also repaired. The pool has now been waterproofed, retiled and repainted ready for swim season.
It is business as usual with enrolments for learn to swim classes now open for term 4.
For more information visit http://www.hornsby.nsw.gov.au/galc